Studio Update 13NOV2011

buy Pregabalin 150 mg I did not get nearly as far as I had hoped with a three day weekend. However, I did manage to get a quote on the installation of the donated heat pump, and it's way more than I'm willing to pay. I also managed to board up all of the sagging windows before the real cold gets here. And I got four of the six "faux walls" installed and the last two framed up. Not a bad weekend after all.

#ab

In album Shots from the studio (3 photos)

http://davidpisarra.com/wp-content/plugins/wp-automatic/changelog Google+: View post on Google+

Leave a Reply

Your email address will not be published. Required fields are marked *